HOT
LED Display on the North Side of the Waiting Hall, Chongqing North Railway Station

LED Display on the North Side of the Waiting Hall, Chongqing North Railway Station

Professionalism for brilliance, quality to win the world
Area: ChongqingType: high-speed railwayFormat: ledFrequency: 300
Adjacent to the entire waiting seat area on the north side, the northbound ticket checking passage and train schedule information guidance screens, this is the core access point for passengers entering the waiting area after passing security check at the North Square and transferring upstairs to Metro Lines 4 and 10. It fully covers all passenger flows for waiting and ticket checking on the north side without any obstruction from columns or walls.

Quote

¥40 W-80 W
Tips:Match different media resources to generate quotation proposals and support downloading
HOT
Landmark Digital Screen Outside the North Square of Chongqing North Railway Station

Landmark Digital Screen Outside the North Square of Chongqing North Railway Station

Tech Chips, New Life
Area: ChongqingType: high-speed railwayFormat: ledFrequency: 300
As a major high-speed rail hub in southwest China, the station handles over 250,000 passenger trips daily. The North Square accommodates 70% of the station’s main passenger flow. This location steadily reaches more than 170,000 people each day, with a peak volume of over 220,000 during holidays. The massive and consistent foot traffic ensures sustained brand exposure.

Quote

¥35 W-70 W
Tips:It can match different media resources to generate quotation proposals and support downloading
HOT
LED Screens at Check-in Gates on Departure Floor of Chongqing North Station

LED Screens at Check-in Gates on Departure Floor of Chongqing North Station

Stand tall in splendor, radiate glory across the world
Area: ChongqingType: high-speed railwayFormat: ledFrequency: 240
Installed on both sides of each ticket checking gate in the waiting halls of the North and South Squares of Chongqing North Railway Station, these facilities lie along the only visual route that passengers must pass through when taking seats while waiting, queuing up, and proceeding through ticket checks to board trains. There are no pillar obstructions, blind spots in sightlines, and no alternative bypasses available.

Quote

¥13 W-26 W
Tips:A quotation plan can be generated by matching different media resources and downloaded.
Total2 PageGo to Page

My
Compare

My
Project

Compare Media

Max Compare3pcs

No media to compare
Start CompareClear all

Add Plan

Export when done

No media plans
My PlansClear all