The main waiting hall on the second floor is an exclusive core area solely for departing passengers after security check, free from the interference of crowds exiting or meeting arriving passengers, boasting an industry-leading concentration of target audiences. All departing passengers must pass through this space for the entire waiting and ticket checking process. The advertising spots are situated close to waiting seats and ticket gates, with no pillar obstructions or blind visual spots.
Located at the only interchange hub of the arrival and departure passages, this spot is an essential node for all two-way passenger flows at Jiaxing South Railway Station. It covers two major crowds: passengers exiting the station and those transferring to board trains, forming a closed-loop dual exposure effect that captures passengers' first sight upon arrival and last sight before departure.
The media devices are installed on both sides of the lounge area in the waiting hall, directly in the line of sight with no obstructions, forcing passengers to view the ads. This ensures the advertising messages fully reach departing travelers. Placed in prominent spots to capture mandatory attention, they deliver efficient communication and exert profound influence on audiences.
The core position on the lintel directly above the exit is an indispensable thoroughfare for all arriving passengers leaving the station, with no passenger diversion zones or blind spots. It serves as the first brand advertisement that passengers see upon arriving in Jiashan when they look up, exclusively occupying the primary visual entry point for all outbound passenger flow at the entire station.
Located at the busiest passageway inside Jiashan South Railway Station, all passengers entering the station to wait for trains or exiting to leave the station have to pass through this area within a short period. Its unique location guarantees that brand messages can reach every passenger, boasting an extremely high media exposure rate.
This media placement is directly in the line of sight of passengers exiting from the platform floor with no obstructions, ensuring mandatory viewing. Its appropriate height and viewing distance, coupled with ample time for ad viewing, enable advertising messages to fully reach the target audience.
This media is positioned directly in front of incoming passengers inside the waiting hall. It reaches all people entering the station and waiting for trains for efficient communication. It maintains zero-distance contact with passengers with strong mandatory visibility, effectively covering all waiting crowds. Every detail is fully displayed to exert in-depth influence on the audience.
Media installations are centrally arranged on the main wall facing the primary lounge area of the waiting hall. They are directly visible from all passenger seating without obstruction by columns, ticket checking screens or wayfinding signs, achieving 100% visual coverage of all departing passengers with no blind spots caused by passenger flow diversion.