- Photos
- Specs
- Advantages
- Value
- Media Map


| Area:Chongqing | Type:high-speed railway | Frequency:200 |
| Address:No. 51 Kunlun Avenue, Liangjiang New Area | Format:led | Duration:10s |
| Location:Exit Passage of Chongqing North Station | Min Qty:24 | Operating Time:6-24o'clock |
| Size:5*1.5 | Min Period:month |
Suspended above the exact center of the exit passage of Chongqing North Railway Station, hanging screens are installed at various positions along the passage with a top-down viewing angle. They stand out as a striking visual focal point amid bustling exiting crowds. Located on the only route all departing passengers must pass through, the screens achieve full coverage of all exit passenger flow. Chongqing North Railway Station records an annual passenger volume exceeding 87 million, and this massive passenger base guarantees extremely high exposure for this advertising spot.
Proceeding along the main passage to the ground floor of the North Square, this screen serves as the primary visual focal point. The average dwell and viewing time surpasses 12 seconds, with an information recognition rate of nearly 100%. Vertically suspended from the ceiling of the exit passage, it features synchronized dual-sided display that covers all passenger routes exiting the North Square, delivering all-round bidirectional coverage without blind spots. Its conversion rate is 30% higher than advertisements in waiting areas, with dense exposure frequency and balanced communication rhythm that continuously deepen brand impressions.
The equipment adopts a high-end ultra-thin dual-sided hanging LED structure. Its independent high-definition displays simultaneously cover passengers moving in both directions along the passage, completely eliminating visual blind spots and wasted traffic associated with single-sided media. Equipped with high-definition and high-brightness display modules, the screen delivers precise color reproduction and delicate image texture, adapting to the indoor lighting conditions of the passage in both bright and dim environments. Its content remains clearly visible even from long distances and when viewers are walking dynamically.
Boasting four core strengths—prime location, innovative design, targeted audience reach and immersive experience—it stands as a benchmark within Chongqing’s high-speed rail media matrix. It delivers communication value superior to traditional channels, enabling seamless integration between advertising and consumption scenarios. Brand exposure can be directly converted into consumption at surrounding commercial districts, forming an investment value system that balances short-term returns and long-term appreciation, making it a top choice for premium brands to tap into offline traffic.
With its suspended aerial visual effect, double-sided exposure capacity and spatial guidance features, it elevates the tech aesthetic of station halls while naturally drawing passengers’ upward gaze and significantly extending effective viewing duration. Maximum returns are achieved through a combined strategy of short-term targeted advertising campaigns and long-term asset ownership. Driven by the digital transformation of the industry and rising regional value, this media asset holds substantial appreciation potential.
The double-sided suspended screen at the center of the exit passage is the only landmark suspended media installation along the central exit flow line of the North Square of Chongqing North Railway Station. Supported by the essential core passenger exit route, full-view double-sided design and high-conversion offline scenarios, it ranks as a premium media spot with the strongest passenger attraction and most comprehensive exposure coverage on the arrival floor of Chongqing North Railway Station. It delivers dual core values: building brand prestige and driving instant local customer conversion, making it suitable for all categories of brands to cultivate regional markets and launch high-impact marketing campaigns during key promotional periods.











